Megastructures: Sheikh Jaber Al-Ahmad Al-Subah Causeway Project of Kuwait - 4th Longest Bridge of the World
Author(s):Tomme: 63 (67) | Fascicle: 2 | 2017
Pages: 27-42
Abstract text:
This paper presents a particular situation about technology optimization required for the project execution of the Sheikh Jaber Al-Ahmad Al-Subah Causeway bridge pillars in Kuwait. The initial approach to technological solution regarding the mounting process of the reinforcement cage of the pillars, was not efficient for the minimum time and maximum precision criteria. A new technological system design was proposed and adopted after several attempts, from January to March 2015 through the collaboration of the authors via Skype.
Key Words:
circular steel reinforcement cage; technological system; time optimization
Author(s) Information
George ŢăranuAffiliation: „Gheorghe Asachi” Technical University of Iaşi, Faculty of Civil Engineering and Building Services
Email: gtaranu@ce.tuiasi.ro
Vasile-Mircea Venghiac
Affiliation: „Gheorghe Asachi” Technical University of Iaşi, Faculty of Civil Engineering and Building Services
Email:
Teodor Munteanu
Affiliation: Civil Engineer Boushahri ERGO W.L.L.
Email:
All documents with a icon require
Adobe Acrobat installed on your computer